The Idaho Transportation Department is designing the final phase of the SH-16 extension.

Para solicitar más información sobre este proyecto en Español, por favor llame (208) 334-8008.

Learn More

The vision for State Highway 16

State Highway 16 currently runs from the northern limits of Meridian to the southern limits of Emmett.

ITD is extending the highway south to I-84, providing a much-needed north-south route through the central Treasure Valley. Construction of the highway extension and an interchange at I-84 will be completed in 2024/2025. Learn more about construction.

ITD is now designing the final phase of this project. This final phase will expand the I-84 interchange and complete the interchanges at Franklin Road, Ustick Road, US-20/26 and SH-44.

Construction of the final phase will be scheduled when funds are available.

 

Community input

ITD will continue to gather input from those who live, work and commute in this area. Community members will have an opportunity to review final design plans in the spring of 2023.

ITD will post updates and public meeting dates on this website. To send a comment to the design team, email [email protected].

2006-2011
ITD completed an Environmental Impact Statement for State Highway 16
2012-2014
ITD designed and built the first 2.5 miles from State Highway 44 to U.S. 20/26 (Phase 1)
2017-2019
ITD refined the design for the remaining 5 miles, updated the EIS and reduced the highway footprint
2020-2021
ITD completed final design of Phase 2 (between I-84 and U.S. 20/26)
2021
Leading Idaho Transportation Program funded Phase 2 construction
2021
ITD began design plans for Phase 3
Summer 2022
Construction of Phase 2 begins
2024
Phase 3 design complete
2024/2025
Phase 2 construction complete
Frequently Asked Questions
ITD thanks everyone who participated in online meetings, Q&A sessions or pop-up meetings in 2021. Here are a few of the most frequent questions we received.
General
What is included in Phase 3?
What is included in Phase 3?

In Phase 3, ITD will complete the interchanges at I-84, Franklin Road, Ustick Road, US-20/26 and SH-44 with bridges, allowing motorists to continue along SH-16 without stopping.

General
How much is this going to cost?
How much is this going to cost?

The estimated cost for the design and construction of Phase 3 is approximately $200 million; however, the actual construction cost will be determined based on the final design of these interchanges.

General
When will everything be built (finished)?
When will everything be built (finished)?

It is too early to answer this question because Phase 3 is not yet funded. Once funding is available, ITD will consider the best timing and sequencing of construction.

General
Is ITD planning anything north toward Emmett?
Is ITD planning anything north toward Emmett?

An environmental assessment was completed on this portion of State Highway 16, from SH-44 to the junction of SH-52, in 2004. With the area’s increased growth and construction funded for Phase 2 of the SH-16 extension project, ITD has an environmental re-evaluation scheduled on the Idaho Transportation Investment Program in 2023.

General
What does it mean that SH-16 will be a “limited access” highway?
What does it mean that SH-16 will be a “limited access” highway?

Access on and off the highway will be limited to a few major locations (I-84, Franklin Road, Ustick Road, US-20/26, and SH-44). This allows traffic on SH-16 to continue moving without encountering numerous driveways and side streets. It greatly improves traffic flow.

General
Why is ITD waiting until Phase 3 to construct the interchanges?
Why is ITD waiting until Phase 3 to construct the interchanges?

Building interchanges is a costly investment. Constructing the SH-16 corridor in phases allows ITD to wisely manage its investments, while allowing motorists to benefit from the new highway as soon as possible.

General
When will ITD share design plans for the future interchanges?
When will ITD share design plans for the future interchanges?

ITD will share design plans for future interchanges in Spring 2023. Please sign up to receive emails to learn about the public meeting once it is announced.