Contact Us

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

Western Canyon/Owyhee Counties Corridor Study

ITD is studying several highways for future improvements

A corridor study is a 10 to 20-year plan that considers the needs and treatments of a highway. This study includes the following:
• U.S. 95, Oregon State Line to Jct U.S. 30 (Fruitland)
• U.S. 20/26, Oregon State Line to I-84 (Caldwell)
• ID-19, Oregon State Line to Cleveland Blvd (Caldwell)

Read MoreAsset 1
Questions?Asset 2
Project Details
Click here to open the study

Interactive Study Map

The project team has developed an interactive study map. Access the map by clicking the link below. There you can learn more about:

You can also provide feedback on the study by going to the comment tab.

Click to visit the interactive study map

Working

**All contact information will be kept confidential,
but all comments will be publicly visible**
Interactive Comment Map

Click on map to place comment.

View Map
April 2019
Existing Traffic Analysis Completed
Asset 5
Late Summer 2019
Public Open Houses
Asset 5
Fall 2019
Study Completed
Asset 5

Downloads & Resources

Open House MaterialsAsset 4
Existing Conditions ReportAsset 4
© Copyright 2019 Idaho Transportation Department Visit ITD Website