skip to main content
Idaho Official Government Website Contact Us

US-95 Sealcoat, Gayway Junction to I-84

This sealcoat will preserve the pavement and provide a smooth driving surface.

ITD will sealcoat US-95 from I-84 exit 3, to Gayway Junction in Fruitland.

Reduced lanes, flagging, and pilot car operations will be in place for traffic control measures throughout the project; some delays should be anticipated.

Anticipated Start Date
July/August 2021
Current Conditions
Check 511
Contact Us
© Copyright 2021 Idaho Transportation Department Visit ITD Website

Contact Us

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form