US-95 on-ramp in Lewiston

Sealing the driving surface of the bridge on the northbound on-ramp will keep the structure in service longer.

This bridge is one of thirteen structures on US-95 between Riggins and Lewiston that will be repaired. Not all bridges will be under construction at the same time, so check 511 to learn about current traffic impacts on the highway.

Summer 2020
Detour expected
511
Contact us

Old construction materials to be removed

Materials from the original construction of the bridge are currently stored in its interior. They will be removed to make inspections of the interior easier and prevent damage from moisture buildup. A detour will be in place for this portion of the work.