skip to main content
Idaho Official Government Website Contact Us

Scaling on US-2 and SH-200

Scaling rocky areas above the highways will bring down loose material in a safe manner.

Two locations on US-2 between Priest River and Laclede, along with three locations near Trestle Creek and Clark Fork, will undergo weeks of scaling to bring down loose rock. This will help keep rocks from unexpectedly falling to the road in the future and save our operations staff time.

Fall 2022
30 minute closures
Check 511
for traffic impacts
Contact us
© Copyright 2021 Idaho Transportation Department Visit ITD Website

US-2 and ID-200 scaling

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form