skip to main content
Idaho Official Government Website Contact Us

US-12: Big Smith Creek

Replacing the existing pipe at Big Smith Creek with a small bridge will allow more fish to swim upstream.

The pipe at milepost 90 (near Edgewater Road in Syringa) blocks travel for fish upstream with its steep grade, but a new bridge will remove that blockage. The project is funded by the U.S. Forest Service, Nez Perce Tribe and ITD. Depending on the timing of U.S.F.S. funding, design could be completed, and the project could go to construction in 2021.

Read More
© Copyright 2021 Idaho Transportation Department Visit ITD Website

Contact us

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form