US-93: Blue Lakes Boulevard to Pole Line Road

The Idaho Transportation Department is rehabilitating a portion of US-93 within the city of Twin Falls.

The project will begin just south of Pole Line Road and extend to the Perrine Bridge. Both northbound and southbound lanes will be rehabilitated and the outside southbound lane from Fillmore Street to Canyon Springs Road will be fully reconstructed.

Anticipated Construction
May - July 2021
Signals
The traffic signals at the intersection of Blue Lakes Blvd. and Fillmore St./Bridgeview Blvd. will be replaced
Pedestrian
Pedestrian ramps in the area will be replaced
Questions or Comments?

Construction Impacts

Nighttime Work
- Roadway construction will occur between the hours of 9 pm and 7 am to reduce impacts to the traveling public.

Business Access
- At least one access point for Blue Lakes Boulevard will be maintained for businesses in the area.

Closures
- Perrine Street will be closed for approximately five (5) days during roadway construction activities.

Intersection Closures
- Occasionally, shoulders and outside lanes will be closed for work to occur on the traffic signals at the Blue Lakes Boulevard and Fillmore Street/Bridgeview Boulevard intersection.
- Occasionally during nighttime construction, the Blue Lakes Boulevard intersections at Fillmore Street/Bridgeview Boulevard and Pole Line Road will be controlled by flaggers.

Lane Closures
- One (1) lane of travel will be maintained in each direction during nighttime work.
- Two (2) lanes of travel will be maintained in each direction during daytime hours.
- Lanes will be reduced to a minimum width of 11 feet.

For an image of the project area and limits, click here.
June 2020
Project presentation before the Twin Falls City Council
Asset 5
August 2020
One-on-one meetings with area business owners
Asset 5
Fall 2020
Public Open House - Project overview
Asset 5
Spring 2021
Public Open House - Pre-construction overview
Asset 5
© Copyright 2020 Idaho Transportation Department Visit ITD Website

We want to hear from you.

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form