skip to main content
Idaho Official Government Website Contact Us

US-26: X Canal Restoration

This project will rehabilitate the X Canal structure located near milepost 150 in Gooding.

During construction, the bridge will be resurfaced, bridge joints will be replaced, and the railing will be repainted.

Anticipated Timing
February - April 2021
Traffic Impacts
The roadway will be reduced to a single lane in each direction.
Traffic Closure
A temporary closure of the US-26 approach from California Street will be necessary for a portion of the project.
Questions or Comments?
© Copyright 2021 Idaho Transportation Department Visit ITD Website

Please share your thoughts.

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form