skip to main content
Idaho Official Government Website Contact Us

US-26: Lateral Canal Restoration

This project will replace the Lateral Canal structure located east of Bliss.

During construction the old structure, which has reached its design life, will be replaced with a concrete box culvert.

Anticipated Timing
January - April 2021
Traffic Impacts
The roadway will be reduced to a single lane with temporary signals in place to control traffic.
Location
Milepost 140
Questions or Comments?
© Copyright 2021 Idaho Transportation Department Visit ITD Website

Please share your thoughts.

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form