Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

US-20 Lorenzo Bridge Repair

The Idaho Transportation Department is working to improve the US-20 Lorenzo Bridge.

ITD has began construction on the US-20 Lorenzo Bridge in Madison County. The bridge rehabilitation construction started in April and is expected to be completed this fall. This rehabilitation will entail re-surfacing of the bridge deck, replacing the guardrail, improving the bridge approaches and finishing with new pavement. This project will greatly improve and extend the lifespan of the bridge. Drivers can expect traffic delays for the duration of the project. Reduced speed limits will be effect and traffic will be shifted over periodically to single lane two way traffic.

Comment Form
Contact Us
April 2019
Begin Construction
Asset 5
Fall 2019
Finish Construction
Asset 5
© Copyright 2019 Idaho Transportation Department Visit ITD Website