Default Project Comment Form
Drop a file here or click to upload Choose File
Maximum upload size: 8MB
Drop a file here or click to upload Choose File
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

US-20 Curr Canal Bridge Replacement

The Idaho Transportation Department is working to improve the Curr Canal bridge on US-20.

ITD has began construction on the US-20 Curr Canal bridge in Chester as of April and is expected to be completed in May. This projects consists of a full bridge replacement as the current bridge has past its aging lifespan.

Comment Form
Contact Us
April 2019
Resume Construction
Asset 5
May 2019
Finish Construction
Asset 5
© Copyright 2019 Idaho Transportation Department Visit ITD Website