skip to main content
Idaho Official Government Website Contact Us

SH-53 and Ramsey Road

Installing a permanent signal and adding turn lanes in 2023 will improve safety at this intersection.

After construction all roads at the intersection will have dedicated right and left turn lanes, as well as through lanes.

Construction

The existing temporary signal that was installed in 2019 during the construction of the US-95 and SH-53 Interchange to help with detoured traffic will be removed. Then new lanes will be added, and a permanent signal will be placed.

During six months of work, drivers can expect to be stopped further back from the intersection and guided by smaller, temporary traffic signals.

MORE INFO
© Copyright 2024 Idaho Transportation Department Visit ITD Website

SH-53 and Ramsey: contact us

Default Project Comment Form

Maximum file size: 8MB

Maximum file size: 104.86MB

Signup Form