SH 16 Construction FAQs

Frequently Asked Questions

Not seeing an answer to your specific question? You can submit your question here.

Sign up to receive updates
Text 16CORRIDOR to 1-866-483-8422 to opt in to email or text alerts.
Para más información y para recibir una hoja de inforamación
Por favor llame (208) 334-8002 presione 2 para Español
Submit your question here
Frequently Asked Questions
What will be the height of the new highway?
What will be the height of the new highway?

When Phase 2 is complete, the highway will be 5 to 20 feet off the surrounding ground. The highest elevations (around 17-20 feet) will occur at overpasses such as Cherry Lane and McMIllan Road. In these locations, SH-16 will cross over the local roads.

In Phase 3, the highway elevation will be raised at each future interchange location (Franklin Road, Ustick Road, US-20/26 and SH-44). Elevated flyover ramps – up to 50 feet in elevation — will also be constructed at the I-84 interchange in Phase 3.

Will the new highway be opened all at once?
Will the new highway be opened all at once?

The opening schedule has not yet been determined. Construction of Phase 2 is expected to be completed in 2025.

When Phase 2 opens, how many times will motorists need to stop at traffic signals?
When Phase 2 opens, how many times will motorists need to stop at traffic signals?

When Phase 2 opens, motorists on SH-16 will stop at traffic signals at I-84, Franklin Road, Ustick Road, and US-20/26.

What will Phase 3 include?
What will Phase 3 include?

In Phase 3, ITD will expand the I-84 interchange and will complete the interchanges at Franklin Road, Ustick Road, US-20/26 and SH-44. This will allow motorists to continue along SH-16 without stopping if they do not wish to exit the highway. Please visit itdprojects.org/sh16design for more information about Phase 3.

How will motorists at Cherry Lane and McMillan access SH-16?
How will motorists at Cherry Lane and McMillan access SH-16?

ITD will construct overpasses over Cherry Lane and McMillan Road during Phase 2. Motorists will not be able to access SH-16 at these locations. Motorists will instead be able to access SH-16 at nearby Franklin Road, Ustick Road, or US-20/26.

Is ITD planning to build noise walls along SH-16?
Is ITD planning to build noise walls along SH-16?

The SH-16 project does not meet the federal criteria for sound walls.