skip to main content
Idaho Official Government Website Contact Us

ID-9: Palouse River

The existing driving surface of the bridge just south of Harvard will be removed and replaced.

At the same time, expansion joints that allow the 110-foot-long structure to expand and contract with the weather will be redone.

June and July 2021
One lane closed
Reduced width
check 511
Contact us
© Copyright 2021 Idaho Transportation Department Visit ITD Website

ID-9: Palouse River

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form