skip to main content
Idaho Official Government Website Contact Us

ID-8: Potlatch River

The existing driving surface of the bridge just west of Bovill will be removed and replaced.

At the same time, expansion joints that allow the 51-foot-long structure to expand and contract with the weather will be redone.

Read MoreAsset 1
Contact usAsset 2
Construction in 2021
© Copyright 2020 Idaho Transportation Department Visit ITD Website

ID-8: Potlatch River

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form