ID-52, Downtown Emmett Repave

Repaving deteriorated asphalt in downtown Emmett

Highway 52 will be repaved from the junction with Highway 16 to the Payette River bridge during the summer of 2020. This will refresh the roadway through central Emmett. ITD will also install ADA-compliant curb ramps at intersections and construct curb, gutter and sidewalk along KT's Lanes in order to improve pedestrian safety and mobility.

Construction Cost
$4.6 Million
Project Start
Late Spring 2020