Contact us

Default Project Comment Form
Drop a file here or click to upload Choose File
Maximum upload size: 8MB
Drop a file here or click to upload Choose File
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

ID-200: Center Turn Lane in Kootenai

Adding a center turn lane will allow turning drivers an area to safely wait on this two-lane highway in town.

The center turn lane will be added from McGhee Road to Kootenai Bay Road by shifting the highway to the south. As part of this project, routine drainage improvements will be constructed, and not all existing access from side streets will be maintained.

Read MoreAsset 1
Contact usAsset 2
Construction in 2022

Railroad Avenue and Pedestrian Improvements

At the request of the city, ITD explored options to add pedestrian and bicycle improvements along Railroad Avenue, which is state property maintained by the city. While this would align with the city’s multi-modal plan and a previous corridor study, improvements to Railroad Avenue are beyond the scope of the current project, and data does not demonstrate a need or safety issue with pedestrian access in the area.

Pedestrian and bicycle improvements could be incorporated into the project if alternative funding from the city became available.

 

© Copyright 2019 Idaho Transportation Department Visit ITD Website