ID-19, Downtown Homedale Rebuild

This project will excavate the road surface and base and rebuild it to modern specifications

This reconstruction project will completely rebuild the road and drainage features of the highway from N 4th St W to N 4th St. E in downtown Homedale. New drainage will be constructed alongside a new road base and fresh asphalt surface.

El proyecto de reconstrucción reconstruirá completamente la carretera y el drenaje de N. 4th St W. to N. 4th St. en el centro de Homedale. El drenaje será construido junto a una nueva base y superficie de asfalto.

Construction Cost
$2.1M
Contractor
Knife River
Timeline
June - August
Contact Us

Project Details

The project will include the following improvements

  • New drainage
  • New road base
  • New asphalt surface
  • Updating pedestrian curb cuts to meet ADA standards
  • Improved marked crosswalk at Homedale Senior Center
  • Removal of a some parking spots for better visibility of stop signs

 

Crews will work in four block sections at a time. Half of the road will be closed, either the north or south side. Enough space remains to generally allow one lane of travel in each direction to be maintained.

 

El proyecto incluye las siguientes mejoras:

  • Nuevo drenaje
  • Nueva superficie de asfalto
  • Mejorar rampas en la orilla de la banqueta
  • Mejoras del paso de peatones en frente del Centro de Personas Mayores en Homedale (Homedale Senior Center)
  • Eliminación de estacionamiento para proveer visibilidad de altos.

Personal trabajará entre cuatro cuadras a la vez. Una línea de tráfico será abierta, la otra será cerrada.

Construction Impacts

Work will generally be active from 7 a.m. to 7 p.m. This will include loud noises and vibration from heavy equipment.

Business access will remain open, though specific approaches on ID-19 will require short closures. Alternate access is generally available from a local street.

Though a travel lane in each direction will generally remain open, some closures are needed. In these situations, traffic will be detoured to Wyoming Avenue or Owyhee Avenue, depending on the location of the closure.

Pedestrian facilities and walk-up business accesses will remain open throughout construction.

 

El trabajo tomará acabo durante las 7 a.m. a las 7 p.m. Incluye ruidos fuertes y vibraciones dado a la construcción.

Acceso a negocios se mantendrá abierta. El cierre a corto plazo de la entrada a ID-19 ocurriera. Acceso alternativo será disponible de una calle local.

Aunque una línea de tráfico será abierta, hay necesidad de cierres. En estas situaciones, tráfico será desvío a Wyoming Ave o Owyhee Ave dependiendo de la ubicación del cierre.

Instalaciones peatonales y acceso a negocios se mantendrá abierta durante la construcción.

Project Map

Working

Interactive Comment Map

Click on map to place comment.

View Map
© Copyright 2021 Idaho Transportation Department Visit ITD Website

Contact the Project Team

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form