ID-13: Sally Ann Creek

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

ID-13: Sally Ann

Upgrading this culvert north of Harpster will make it more fish-friendly and able to handle more water during flooding events.

The new bottomless culvert at milepost 15 will be longer, requiring the highway to shift west approximately 10 feet. Guardrail will be replaced, and the steep bank on the riverside will be stabilized with a gabion wall.

Read MoreAsset 1
Contact usAsset 2
Construction in 2022
© Copyright 2020 Idaho Transportation Department Visit ITD Website