State Highway 21, Technology to Surprise Way Center Turn Lane Construction

The project will provide a new center turn lane on State Highway 21 between Technology and Surprise Way, providing safe turning movements for residents entering and exiting their neighborhoods on this busy stretch of highway.

Construction will begin in May 2022 on the south side of the highway. When paving is complete, traffic will shift to the new pavement as crews complete the widening on the north side of the highway. Work is scheduled for completion in late July. The anticipated work schedule is Monday through Friday, 7 a.m. to 7 p.m. Motorists can expect reduced speeds through the construction zone, traffic shifts, and periodic delays with flagger control. Access will be maintained to all neighborhoods throughout construction.

May 23, 2022
Construction scheduled to begin on south side of highway
June 28, 2022
Crews plan to move traffic to the new pavement and begin reconstruction of the existing road surface
© Copyright 2022 Idaho Transportation Department Visit ITD Website

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form