skip to main content
Idaho Official Government Website Contact Us

I-84/US-93 Interchange Ramp Construction

The project will resurface the ramps, upgrade signals, and construct a right turn lane for the westbound I-84 on-ramp to improve traffic flow. Construction is expected to begin August 2023 and last for approximately two months.

IMPACTS

– Lane reductions will be in place at the on and off-ramps ramps south of I-84.

– Temporary closures will occur at the on and off-ramps north of I-84.

– Motorists will drive on a gravel surface during the day when construction is underway on the westbound on and off-ramps.

– Construction on the on and off-ramps will be staggered and no more than one ramp will be closed at a time.

– Each ramp closure is expected to last for approximately 4 nights from 8 p.m. – 5 a.m.

– Motorists will need to use alternate routes when closures are in place.

– Signs, and possibly flaggers or a temporary signal, will be in place to direct motorists.

© Copyright 2023 Idaho Transportation Department Visit ITD Website

Default Project Comment Form

Maximum file size: 8MB

Maximum file size: 104.86MB

Signup Form