FY21 sealcoat: contact us

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

ID-41: Sealcoat

Sealcoating will preserve ID-41 between Blanchard and Oldtown, which was just resurfaced in 2019.

Work will require reduced speeds and lane closures. More details will be shared once a contractor is hired.

Comment Form
12 miles
Summer 2020
Traveler info
Contact us
© Copyright 2020 Idaho Transportation Department Visit ITD Website