I-15 Fort Hall Interchange

The new interchange design will serve the Fort Hall community and the traveling public for many years.

ITD is working with the Shoshone-Bannock Tribes, the local community and the public to design a new interchange at Exit 80 (Fort Hall) on Interstate 15.

Read MoreAsset 1
Project Materials Asset 2
Send a comment
We'd love to hear from you

Project Details

Exit 80 (the Fort Hall Interchange) is the primary entrance into the Fort Hall community from Interstate 15. The current interchange was constructed in 1958.

The new interchange design will include:

Fall 2017
Hold working group meetings with ITD and the Shoshone-Bannock Tribes
Asset 5
Spring 2018
Prepare preliminary design plans. Host working group meetings with ITD and the Shoshone-Bannock Tribes
Asset 5
Summer 2018
Host community open house to gather input on preliminary design plans
Asset 5
Fall 2018 - Winter 2019
Review input and prepare final design plans
Asset 5
Spring 2019
Host community open house to gather input on final design plans
Asset 5
Summer 2022
Construction funding anticipated; begin construction
Asset 5

Downloads & Resources

© Copyright 2020 Idaho Transportation Department Visit ITD Website

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Signup Form