City growth from Locust Grove to Eagle Road require additional lanes to improve safety and mobility.

Over the next few years the Idaho Transportation Department will be making improvements to Chinden Boulevard (U.S. 20/26) between Locust Grove and Eagle Road. Public input and participation is critical to the success of these efforts.

Display boards from previous Public Open Houses can be found in the Downloads and Resources section.

Comment Form
Construction Cost
$9 million
Project Completion
Late 2020
Project Video
Click Here
ChindenWest Home

Background

Chinden Boulevard, a section of U.S. 20/26, is one of the few east-west commuter routes that connects Boise to Interstate 84 in Caldwell. The majority of Chinden between I-84 and Eagle Road is a two-lane rural highway. As the land around the roadway develops, Chinden is becoming a busy urban corridor, particularly between Ten Mile Road and Eagle.

Typical roadway section of ChindenWest Planned Improvements

Sound Wall Information

Sound walls will be constructed on the south side of Chinden, between Stafford Drive and Eagle Road, adjacent to the Bristol Heights neighborhood. State and federal policy require sound walls be constructed when highway projects increase noise for adjacent properties and the majority of those impacted vote in favor of a wall.

This graphic shows the typical section for the 4-lane widening project between Stafford and Eagle.

Timeline of ChindenWest projects from Eagle Road to Star Road
2015-2017
Environmental Assessment
Asset 5
Summer 2019
Design Complete
Asset 5
Early 2020
Construction Begins
Asset 5
Late 2020
Construction Complete
Asset 5

Downloads & Resources

Asset 5
May 2020

Dedicated right-hand turn lane at southbound Eagle Road and eastbound Chinden closed during construction

The designated right turn lane to Eagle Road from eastbound Chinden is closed during construction. Drivers are able to turn right to southbound Eagle Road from the thru lane.

This lane configuration will allow crews to construct new roadway on the south side of Chinden. Commuters should expect increased delays and use alternate routes when possible.

Additionally, Locust Grove at its intersection with Chinden will be closed the night of Friday, May 29th. Traffic will be detoured on McMillan Road to Meridian and Eagle roads.

Email Update
Asset 5
April 21-22, 2020

Chinden reduced to one lane at Locust Grove for utility installation

Chinden Boulevard (US 20/26) at its intersection with Locust Grove Road, will be reduced to one lane with flagger control, Tuesday and Wednesday this week (April 21 and 22) between 9 am and 3 pm, while crews install underground utilities. Traffic will resume to two-lanes, one in each direction, after 3 pm each day.

Significantly reduced traffic in the area has provided the opportunity to perform this work during daylight hours, and expedite the overall project schedule. Traffic on Locust Grove will be open in both directions, controlled by flaggers through the intersection.

Asset 5
April 2020

Traffic Shift Starting 4/10 Will Bring Left Turn Restrictions & Detours

Traffic lanes will shift Friday, April 10 as crews begin paving on the south side of Chinden. Beginning April 11th morning, left turn movements in and out of roads between Locust Grove and Eagle will be restricted. During the shift, traffic will be reduced to one lane with flagger control. Please stay aware of lane shifts and new traffic patterns. Residents can expect moderate illumination and noise impacts. Traffic will resume to normal construction zone conditions (45 mph) Saturday morning.

For the installation of storm drain facilities, access at Royal Park Avenue to and from Chinden will be closed April 13 & 14. Traffic will be detoured to Bennington Way. Bennington Way will then be closed April 15 & 16. During that time traffic will be detoured to Royal Park.

Asset 5
Early April 2020

Spring Traffic Shift Will Bring Removal of Left Turns

Beginning in late March/Early April, traffic lanes will shift as crews begin paving on the south side of Chinden. At this time, left turn movements in and out of roads between Locust Grove and Eagle will be restricted.

Asset 5
March 19, 2020

Overnight Water Line Construction near Royal Park and Bennington

As early as March 19, crews will install water lines across Chinden near Royal Park Avenue and Bennington Way, west of Eagle Road. This work will occur at night and take several days. Traffic will be reduced to one lane with flagger control. Residents can expect moderate illumination and noise impacts. Traffic will resume to normal construction zone conditions (45 mph) in the morning.

Asset 5
Spring 2020

Late March Traffic Shift Will Bring Removal of Left Turns

Beginning in late March/Early April, traffic lanes will shift as crews begin paving on the south side of Chinden. At this time, left turn movements in and out of roads between Locust Grove and Eagle will be restricted. The shift will occur at night. During this time traffic will be reduced to one lane with flagger control. Residents can expect moderate illumination and noise impacts. Traffic will resume to normal construction zone conditions (45 mph) in the morning. More details to come.

Asset 5
1/31/2020 - 2/7/2020

Night Work Between Locust Grove and Eagle Road

Starting the week of February 3rd, motorists can expect periodic overnight lane reductions with flagger control. Area residents may hear construction related noise. We appreciate your patience and cooperation.

More information

Project
Updates

ChindenWest June 2020 Update Video

June 2020 Construction Update Video

Sign Up for Updates

© Copyright 2020 Idaho Transportation Department Visit ITD Website

Leave a comment or sign up for updates.

Default Project Comment Form
Maximum upload size: 8MB
Maximum upload size: 52.43MB

Sign Up for Future Email Updates

Signup Form