I-84, Galloway Road Bridge Rehabilitation

The road surface on the bridge will be rehabilitated

Work is limited to the Galloway Road bridge spanning I-84. Crews will mill off the top layer of the existing asphalt. Then, using high-powered water pressure, a process called "hydroblasting," the top layer of the bridge deck will be removed. Fresh concrete pavement will be laid down to create a new surface and extend the life of the bridge. New asphalt on the approaches to the bridge will ensure a level transition between the road and bridge. New guardrail on bridge parapets will improve safety.

Comment Form
Project Start
Mid-July 2019
Project End
October 2019
Hydroblasting Video
Click Here
Canyon County Bridge Rehabs

Traffic Impacts

Traffic on I-84 will not be impacted with this project.

Traffic on Galloway Road will be reduced to one lane and a temporary signal will control traffic. Expect delays of no more than 15 minutes.