Contact the project team

Default Project Comment Form
Drop a file here or click to upload Choose File
Maximum upload size: 8MB
Drop a file here or click to upload Choose File
Maximum upload size: 52.43MB

Signup Form
Survey Form
0% Complete
1 of 3

Couple of lines for a question depending on the length

I-84, U.S. 30 Interchange Bridge Rehab

The road surface on the bridge will be rehabilitated

Work is limited to the U.S. 30 bridge spanning I-84. Crews will mill off the top layer of the existing asphalt. Then, using high-powered water pressure, a process called "hydroblasting," the top layer of the bridge deck will be removed. Fresh concrete pavement will be laid down to create a new surface and extend the life of the bridge. New asphalt on the approaches to the bridge will ensure a level transition between the road and bridge. New guardrail on bridge parapets will improve safety.

Comment Form
Traffic Impacts
Click for 511 info
Project End
Late Fall 2019
Hydroblasting Video
Click Here
Canyon County Bridge Rehabs

Traffic Impacts

Traffic on I-84 will not be impacted with this project.

Traffic on will be reduced to one lane and a temporary signal will control traffic. Expect delays of no more than 15 minutes.

© Copyright 2019 Idaho Transportation Department Visit ITD Website