I-84, SW 1st Ave Bridge Rehabilitation

The road surface on the bridge will be rehabilitated

Work is limited to the SW 1st Ave bridge spanning I-84. Crews will mill off the top layer of the existing asphalt. Then, using high-powered water pressure, a process called "hydroblasting," the top layer of the bridge deck will be removed. Fresh concrete pavement will be laid down to create a new surface and extend the life of the bridge. New asphalt on the approaches to the bridge will ensure a level transition between the road and bridge. New guardrail on bridge parapets will improve safety.

Comment Form
Project Start
End of April 2019
Project End
End of July 2019
Hydroblasting Video
Click Here
Canyon County Bridge Rehabs

Traffic Impacts

Traffic on I-84 will not be impacted with this project.

Traffic on SW 1st Ave. will be reduced to one lane. A temporary signal will control traffic. Expect delays of no more than 15 minutes.